top of page

Narva Lidl

andre7342



Papapaparim summer is over, but the time has come to build a new Lidl grocery store in Narva!


For us, this is already the third Lidl store in a row, the steel of which we have produced and installed.


It is a rather time-consuming project, because most of the details have to be covered with fireproofing, the technology of which requires very thick layers of paint and a long drying time!


We thank the client Tallinna Ehitustrust OÜ for the trust!


Total volume approx. 70T.

 
 
 

Comentarios


AMV Metal 2022 

bottom of page