

Papapaparim summer is over, but the time has come to build a new Lidl grocery store in Narva!
For us, this is already the third Lidl store in a row, the steel of which we have produced and installed.
It is a rather time-consuming project, because most of the details have to be covered with fireproofing, the technology of which requires very thick layers of paint and a long drying time!
We thank the client Tallinna Ehitustrust OÜ for the trust!
Total volume approx. 70T.
Comentarios